|
Today I worked on the original top to
the ice box.
#1 The removal of the original foam
insulation.
#2 The removal of the screws that were
hidden under the fiberglass.
#3 Inside of top after being cleaned.
#4 The fiberglass joint is next at the
rear. It was cleaned sanded and
ready to
add more fiberglass.
#5 Lastly, is the top was clean and
ready to be reinstalled. I an now waiting on the 90 degree PCV
for the corners. I should have less than 4 hours left to
finish off the the box. I will be using the super cold
Waeco combination as a cooling source.
Roscoe |